VertPro® Energy Benchmarking Platform

VertPro - Logo
powered-by-vertenergygroup@2x.png

Sign in

SF Fire Code Section 1103.7.6.1

Multi-Family Deadline: July 1st, 2024

Submitting Engineering Drawings Before the Deadline Will Save You from Fines/Penalties, Even If the Work Is Completed Post-Deadline

Sign-Up For a Consult With a Project Advisor to Receive Multiple Proposals from Fire Safety Engineers:

VertPro - Fire Alarm Systems

The City of San Francisco requires all multi-family buildings to upgrade fire alarm systems to pass the “Pillow Test” to comply with the SFFC Section 1103.7.6.1.

After several devastating apartment fires hit the City in 2016, the San Francisco Board of Supervisors passed legislation to seriously strengthen safety in multi-family properties. Most of these requirements went into effect shortly thereafter. However, a new mandate goes into effect on July 1, 2024, requiring a manual fire alarm system that would be more likely to wake sleeping residents.

These new alarms are more effective not just because they are louder, it is due to the fact they use low-frequency horns or speakers that are more likely to wake a sleeping person. These lower frequencies require more energy to make them sound and unfortunately most existing fire alarm systems are not designed to handle the additional power required.

Therefore, a new system will often be required to be installed before July 1, 2024

Fill out the fields above to receive assistance with finalizing your proposals. For any questions, you may reach me at Mike.Wolford@VertEnergyGroup.com or give me a call at (657) 391-0663.